Spuff
Suspended / Banned
- Messages
- 1,236
- Name
- Paul
- Edit My Images
- Yes
What a pain in the proverbials - not all builders, of course, just the ones I have carefully chosen.
It's a pretty straightforward job - replace an existing single block paved driveway and extend it into a small front garden so as to give parking for two or three cars. Due to other jobs they've been turning up at lunchtime all this week but this morning they're here at the crack of dawn. The grounds been pretty much prepared to a "good enough" standard so they start laying blocks in earnest. I got called out front to see the gradient and be told that it doesn't need any drainage (they'd capped the original soakaway) because water can run off the drive across the pavement and into the roadside drain :bonk:
The briefest of looks at building regs tells you that this is a complete no no. Why do they try and pull the wool though? To do the job properly would have been very little extra effort/cost but they find it easier not to do it and talk s*** instead. So now they're going to have to lift the blocks and run a drain to the old soakaway.
Then I get the classic "we'll be finished by the end of the day can you nip down the bank and pay us in cash"!! (it'd already been agreed that I'd pay by cheque). I suppose at least I didn't pay anything up front....
Sorry for the mini rant...
It's a pretty straightforward job - replace an existing single block paved driveway and extend it into a small front garden so as to give parking for two or three cars. Due to other jobs they've been turning up at lunchtime all this week but this morning they're here at the crack of dawn. The grounds been pretty much prepared to a "good enough" standard so they start laying blocks in earnest. I got called out front to see the gradient and be told that it doesn't need any drainage (they'd capped the original soakaway) because water can run off the drive across the pavement and into the roadside drain :bonk:
The briefest of looks at building regs tells you that this is a complete no no. Why do they try and pull the wool though? To do the job properly would have been very little extra effort/cost but they find it easier not to do it and talk s*** instead. So now they're going to have to lift the blocks and run a drain to the old soakaway.
Then I get the classic "we'll be finished by the end of the day can you nip down the bank and pay us in cash"!! (it'd already been agreed that I'd pay by cheque). I suppose at least I didn't pay anything up front....
Sorry for the mini rant...
he said he wasfully booked tomorrow but now he can come and have a look... hmmm. 




I hope your Mrs is paying him in kind!